Our Projects

Since 2010 Utilitas has carried out projects and investigations for more than 100 Australia farmers, food processors, municipal and industry clients. Utilitas is now focused on bringing forward a pipeline of biogas utility service projects to become a dominant player in the Asian market.

Case Study 1
Owner Client owned project.
Location Queensland, Australia
Throughput Treats approximately 250KL/day of pig manure (13,000SPU) other organic residuals
Capacity 200kWe (electricity)/286kWt (thermal)
200kWe is enough to power approximately 235 Queensland homes (ref: www.energymadeeasy.gov.au)
Type European style “anaerobic digester tanks”. Continuously Stirred Tank Reactors (CSTR)
Purpose Displace grid electricity on-site to reduce the businesses exposure to increasing electricity costs
Firsts First application of tank based anaerobic digesters in agriculture in Queensland;
First co—digestion project in Queensland
Stage Operational. Connected to Ergon Electricity Network since April 2015
Contract Engineering, Procurement & Construction Management (EPCM)

 


Case Study 2
Owner Client owned project.
Location NSW, Australia
Throughput 3ML/day abattoir waste, 1500hpd Cattle
Capacity 1.2MWe (electricity)/10MWt (thermal)
Type European style “anaerobic digester tanks”. Continuously Stirred Tank Reactors (CSTR) & High Rate Anaerobic (HRA)
Purpose Displace coal in boiler, reduce site wide carbon emissions, reduce other site emissions
Firsts First abattoir in Australia to treat all organic waste streams on-site (solid and liquid) Globally significant biogas project in both scale and scope
Stage Detailed Design
Contract Engineering, Procurement & Construction Management (EPCM)

 


Slider